All hatches removed, sandblasted, re-anodised and resealed.
Cockpit locker lids refurbished with new hinges
Gas locker refurbished
New iroko washboards fitted
New iroko coach roof handrails repfitted
Iroko Rubbing Strake removed and resealed
All deck fittings replaced or refurbished
New Whale Urchin manual bilge pump fitted
New Lagun adjustable cockpit table fitted (removable)
External works below the waterline
Rudder removed and refurbished, rudder bushes replaced and re-greased.
All anodes replaced
All skin fittings checked or replaced
Complete sanding and fairing of hull, keel and rudder
Several coats of International Gelshield 200 two-part epoxy primer.
Two coats of International Micron 350 anti-foul
(2 weeks prior to launch date)
Internal works
All roof linings throughout sanded and painted
All vertical surfaces throughout sanded painted or stained
Galley redesigned with installation of gimballed Plastimo oven, grill and hob
Corian acrylic resin worktops
Stainless steel sink and tap installed
Ceiling handrails removed, refixed, sealed and stained
All lockers cleaned, or repainted
All bilges cleaned and painted
All sea cocks replaced with DZR replacements
Heads compartment stripped and redesigned
Jabsco toilet fitted
New sink and tap fitted
All existing pipework removed and replaced
Forward berth refurbished with suspended ceiling and spot lights.